+۹٦٦ ۹۲۰۰۰۷۷۷۱
اساليب التفتيش الهندسي على المواد المقاومة للحرارة حسب متطلبات معهد البترول الأمريكي
الأهداف

 

This program will help the participants to understand the different mechanical operations of Refractories. Safe operation of Refractory’s requires that all components are protected using proper parts and procedures. This program will provide an overview of all these topics.

الخطوط العريضة

 

  1. A.   General:

1. Definition of Terms

2. Quality Control elements

3. Physical Property Requirements

4. Inspections

5. References.

 

  1. B.   Work Execution:
  2. Documentation
  3. Material Qualification Testing
  4. Applicator Qualification Testing
  5. Installation

 

  1. C.   Testing:
    1. As-Installed Testing
    2. Test Specimen Preparation
    3. Test Procedures

 

  1. D.   Post Installation:
    1. Curing of Newly Installed Linings
    2. Dry out of Newly Installed Linings

من ينبغى أن يحضر

 

All those whose job involves dealing with Refractory Inspection, Inspection Engineers, Mechanical Engineers, Quality Control and Technical Supervisory personnel.

المدة

5 أيام

تاريخ البداية تاريخ النهاية الدولة المدينة
2024-12-22 2024-12-26 Saudi Arabia Dammam

سجل الآن

Please enter full name.
من فضلك ادخل أسمك.
من فضلك ادخل البريد الالكتروني.
ادخل رقم محمول 10 أرقام.