إعادة تشغيل نظام المحطات الفرعية باستخدام التشابك الآمن والحاسوب
الأهداف

 

Upon successful completion of this course, the participant should be getting acquainted with:

  •  Substations types
  •  Circuit Breakers types and Bus – Bar Arrangements.
  •  Power Transformers
  • Substation Auxiliaries and Earthling System and Safety Grounding.
  •  Substation Restoration Systems
  •  Voltage Regulators
  •  Signaling and Alarming Indicators.

الخطوط العريضة

 

Day 1 :

 

  • Power Transformers (Performance - Preventive Maintenance- Parallel Operation).
  • Substation Auxiliaries (Air Compressor - Motors - Batteries- Cooling Fans).
  • Earthling System and Safety Grounding.
  • Lightning Arrestors- Wave Traps - Insulations and Bushings.
  • Instrument Transformers.
  • Power Transformers (Performance - Preventive Maintenance -Parallel Operation).
  • Substation Auxiliaries (Air Compressor- Motors- Batteries- Cooling Fans).
  • Earthling System and Safety Grounding.
  • Lightning Arrestors- Wave Traps - Insulations and Bushings.
  • Instrument Transformers.
  • Protective Relays
  • Classification & Construction Principle of Relays
  • Relay Application & Operation Principles.
  • Protective Relay inspection & test.
  • General Protective Relay Calibration & Checklist
  • Relay Test Point & Test Circuit
  • D.C. (Battery) Control Power Equipment.
  • Type of Batteries
  • Battery Chargers
  • Maintenance & Care of Battery.
  • Battery Tests.
  • Grounding Resistance Measurement.
  • Substation restoration systems
  • Components of restoration system
  • Substation Auxiliaries.
  • Substation SCADA system
  • Earthling System and Safety Grounding.
  • Lightning Arrestors- Wave Traps - Insulations and Bushings.
  • Instrument Transformers.
  • Power Factor Improvement and Voltage Control equipments
  • Voltage Regulators
  • Basic Control Circuit.
  • Signaling and Alarming Indicators.
  • Maintenance Procedures
  • Maintenance Scheduling

 

 

 

Day 2 :

 

  • Power Transformers (Performance - Preventive Maintenance -Parallel Operation).
  • Substation Auxiliaries (Air Compressor- Motors- Batteries- Cooling Fans).
  • Earthling System and Safety Grounding.
  • Lightning Arrestors- Wave Traps - Insulations and Bushings.
  • Instrument Transformers.
  • Protective Relays
  • Classification & Construction Principle of Relays
  • Relay Application & Operation Principles.
  • Protective Relay inspection & test.
  • General Protective Relay Calibration & Checklist
  • Relay Test Point & Test Circuit
  • D.C. (Battery) Control Power Equipment.
  • Type of Batteries
  • Battery Chargers
  • Maintenance & Care of Battery.
  • Battery Tests.
  • Grounding Resistance Measurement.
  • Substation restoration systems
  • Components of restoration system
  • Substation Auxiliaries.
  • Substation SCADA system
  • Earthling System and Safety Grounding.
  • Lightning Arrestors- Wave Traps - Insulations and Bushings.
  • Instrument Transformers.
  • Power Factor Improvement and Voltage Control equipments
  • Voltage Regulators
  • Basic Control Circuit.
  • Signaling and Alarming Indicators.
  • Maintenance Procedures
  • Maintenance Scheduling

 

 

 

Day 3 :

 

  • Protective Relays
  • Classification & Construction Principle of Relays
  • Relay Application & Operation Principles.
  • Protective Relay inspection & test.
  • General Protective Relay Calibration & Checklist
  • Relay Test Point & Test Circuit
  • D.C. (Battery) Control Power Equipment.
  • Type of Batteries
  • Battery Chargers
  • Maintenance & Care of Battery.
  • Battery Tests.
  • Grounding Resistance Measurement.

 

 

Day 4 :

 

  • Substation restoration systems
  • Components of restoration system
  • Substation Auxiliaries.
  • Substation SCADA system
  • Earthling System and Safety Grounding.
  • Lightning Arrestors- Wave Traps - Insulations and Bushings.
  • Instrument Transformers.

 

 

Day 5 :

 

  • Power Factor Improvement and Voltage Control equipments
  • Voltage Regulators
  • Basic Control Circuit.
  • Signaling and Alarming Indicators.
  • Maintenance Procedures
  • Maintenance Scheduling

 

من ينبغى أن يحضر

 

  •  Protection Engineers
  •  Plant Engineers
  •  Operations Engineers
  •  Electrical Maintenance Engineers
  •  Instrument and Control Engineers
  •  Electrical Technicians
  •  Electrical Inspectors
  •  Electrical Operation Supervisors

المدة

5 أيام

تاريخ البداية تاريخ النهاية الدولة المدينة

سجل الآن

Please enter full name.
من فضلك ادخل أسمك.
من فضلك ادخل البريد الالكتروني.
ادخل رقم محمول 10 أرقام.