+۹٦٦ ۹۲۰۰۰۷۷۷۱
الرقابة الصحية
الأهداف

 

  • Create safe working environment
  • Assure group of staff who could help in any work area’s injury
  • Reduce work mortality & morbidity rate.

 

 

الخطوط العريضة


 

1- Basic Safety Rules

2-Safety Program for Contractor Personnel

3- Fire, Safety, Health & Environmental Training

4- Safe Work Permit

5-Master Tag/Lock Out

6- Physical Entry into Confined Spaces

7- Preparation of Equipment for Maintenance

8- Excavation

9- Vehicle Entry into Hazardous Areas

10-Hot Tap/Welding Procedure

11- Elevated work

12- Mobile Cranes

13-Accident/Incident Investigation and Reporting

14-Pre Start up Safety Review

15-Occupational Injury/Illness Reporting

16- Area Classification - Electrical

17-Area Classification - Ignition Sources

18-Unsafe Condition reporting (Near Miss)

19-Caution Tags

20-Facility Change Safety Review(MOC)

21-HAZOP Review (PHA)

22- Control of Piping & Instrumentation Diagrams

23-Technical Operating Procedures

 

24-Process Safety Information

25-Relief Devices

26-Hose Standards - Use, Test, and inspection

27-Tanks and Pressure Vessels - Test and Inspection

28-Use of Oxygen, Explosivity, and Toxic Gas Meters

29-Testing of Over speed Trip Mechanism

30-Management of Safety Critical Instruments

31- Emergency Communication

32-Emergency Alarms and Response

33-Flammable and/ or Toxic Vapor Cloud Response

34-Non-Emergency use of Fire Water, Fire Hose, and Hydrant

35-Automatic Fire Protection systems - Operation and Functional Testing

36-Control and Communication of Chemical Hazards

37-Respiratory Protection

من ينبغى أن يحضر


Safety employees and Auditors

المدة

5 أيام

تاريخ البداية تاريخ النهاية الدولة المدينة

سجل الآن

Please enter full name.
من فضلك ادخل أسمك.
من فضلك ادخل البريد الالكتروني.
ادخل رقم محمول 10 أرقام.