+۹٦٦ ۹۲۰۰۰۷۷۷۱
مشرف تشييد السقالات المعتمد
الأهداف

 

After successfully completing the course, the participants will be better able to

  • Specify the General Requirements for Frame, Tube & Clamp, and System Scaffolds.
  • Determine the hazards associated during erection, dismantling, altering and using of scaffolds.
  • Determine the Specific Safety Rules and Steps Associated with the Erection of Frame, Tube & Clamp and System Scaffolding.
  • Identify the Major Items to Consider when Performing a Scaffold Inspection.
  • Specify the Major Elements of OSHA's Regulation 29 CFR Subpart L - Scaffolding.
  • Design and calculate the scaffold loads

الخطوط العريضة

DAY ONE: 

 

  • 8:00-8:30         Registration & Coffee
  • 8:30-9:00         History of Scaffolds Accidents
  • 9:00-09:30       Definitions
    • Scaffold Competent Person
    • Scaffold Qualified Person
    • What is Scaffold
    • Parts of Scaffolds

  • 09:30-09:45     Break
  • 09:45-10:45     Types of Scaffolds
    • Frame Scaffolds
    • Tube & Clamp Scaffolds
    • Modular Scaffolds
    • Suspended Scaffolds
    • Bracket Scaffolds
    • Mobile Scaffolds

  • 10:45-11:00        Break
  • 11:00-12:00       Scaffolding Work Preparation
  • 12:00-12:45       Prayer Break
  • 12:45- 14:00      Hazards of Scaffolds
    • Falls from Elevation
  • 14:00               End of Day One

 

 

DAY TWO:

 

  • 8:00-8:15            Coffee
  • 8:15-8:45            Review of Day 1
  • 8:45-10:30          Hazards of Scaffolds and General Safety Requirements (Continuation)
    • Scaffolds Ladders
    • Falling Objects
    • Electrocution (Dealing with overhead power lines)
    • Bad Planking Give Away
    • 10:30-10:45        Break
    • 10:45-12:00        General Safety Requirements
      • Scaffolds Platforms and Planks requirements
      • 12:00-12:45        Prayer Break
      • 12:45-14:00        General Safety Requirements (Continuation)
        • Securing of Scaffolds against Collapse (Ties-Guys, etc.)
        • Scaffold Foundation
        • Plumb, Level, and Square of Scaffolds
        • 14:00                  End of Day Two

 

 

 

 

DAY THREE:

 

  • 8:00-8:15         Coffee
  • 8:15-8:45         Review of Day 2
  • 8:45-9:45         Safe Method of Erection & Dismantling of Scaffolds
  • 9:45-10:30       Scaffold Inspection
  • 10:30-10:45     Break
  • 10:45-11:15     Training Video
  • 11:15-12:00     Mobile & Suspended Scaffolds- Aerial Lifts
  • 12:00-12:45     Prayer Break
  • 12:45-13:15     Under hung Scaffold
  • 13:15-14:00     Scaffold Loading
    • Types of Scaffold Loading
    • Introduction to Scaffold Load Calculations
  • 14:00               End of Day Three

 

 

 

DAY FOUR:

 

  • 8:00-8:15         Coffee
  • 8:15-8:45         Review of Day 3
  • 8:45-10:00       Scaffold Load Calculations
  • 10:00-10:30     Different Exercises
  • 10:30-10:45     Break
  • 10:45-12:00     MCQ TEST (Multiple Choices Questions Test)
  • 12:00-12:45     Prayer Break
  • 12:45-14:00     Correcting & Reviewing of MCQ Test
  • 14:00               End of Day Four

 

DAY Five:

 

  • 8:00-8:15         Coffee
  • 8:15-8:30         Review of Day 4 and prepare for practical training
  • 8:45-12:00       Practical Training onsite
  • 12:00-13:00     Prayer Break
  • 13:00-13:30     Ending of Training

من ينبغى أن يحضر

 

  • Construction Forman & Supervisors
  • Scaffold Technician
  • Construction Engineers
  • Safety Engineers, Supervisors and Officers

المدة

4 أيام

تاريخ البداية تاريخ النهاية الدولة المدينة

سجل الآن

Please enter full name.
من فضلك ادخل أسمك.
من فضلك ادخل البريد الالكتروني.
ادخل رقم محمول 10 أرقام.